{
  "notice": "bxzxxr MCP archive: a record of what public MCP servers declared when we listed them (we never call their tools). It is data, not a rating: nothing here says a server is safe, secure, verified or trustworthy, and a server can change after we looked. Secrets we detected are redacted; redacted tool lists are withheld and only their hash is shown.",
  "infrastructure": {
    "host": "mcp.zovo.one",
    "site": "zovo.one",
    "addresses": [
      {
        "address": "104.26.14.32",
        "endpoints": 267,
        "shared_infrastructure": true,
        "network": {
          "asn": 13335,
          "name": "CLOUDFLARENET - Cloudflare, Inc.",
          "prefix": "104.26.0.0/20",
          "country": "US"
        }
      },
      {
        "address": "104.26.15.32",
        "endpoints": 267,
        "shared_infrastructure": true,
        "network": {
          "asn": 13335,
          "name": "CLOUDFLARENET - Cloudflare, Inc.",
          "prefix": "104.26.0.0/20",
          "country": "US"
        }
      },
      {
        "address": "172.67.74.148",
        "endpoints": 267,
        "shared_infrastructure": true,
        "network": {
          "asn": 13335,
          "name": "CLOUDFLARENET - Cloudflare, Inc.",
          "prefix": "172.67.64.0/20",
          "country": "US"
        }
      },
      {
        "address": "2606:4700:20::ac43:4a94",
        "endpoints": 267,
        "shared_infrastructure": true,
        "network": {
          "asn": 13335,
          "name": "CLOUDFLARENET - Cloudflare, Inc.",
          "prefix": "2606:4700:20::/44",
          "country": "US"
        }
      },
      {
        "address": "2606:4700:20::681a:e20",
        "endpoints": 267,
        "shared_infrastructure": true,
        "network": {
          "asn": 13335,
          "name": "CLOUDFLARENET - Cloudflare, Inc.",
          "prefix": "2606:4700:20::/44",
          "country": "US"
        }
      },
      {
        "address": "2606:4700:20::681a:f20",
        "endpoints": 267,
        "shared_infrastructure": true,
        "network": {
          "asn": 13335,
          "name": "CLOUDFLARENET - Cloudflare, Inc.",
          "prefix": "2606:4700:20::/44",
          "country": "US"
        }
      }
    ],
    "addresses_recorded": true,
    "address_history": [
      {
        "addresses": [
          "104.26.14.32",
          "104.26.15.32",
          "172.67.74.148",
          "2606:4700:20::ac43:4a94",
          "2606:4700:20::681a:e20",
          "2606:4700:20::681a:f20"
        ],
        "first_seen": "2026-11-22T21:54:01.579Z",
        "last_seen": "2026-11-22T21:54:01.579Z",
        "checks": 1
      },
      {
        "addresses": [
          "104.26.15.32",
          "172.67.74.148",
          "104.26.14.32",
          "2606:4700:20::681a:f20",
          "2606:4700:20::681a:e20",
          "2606:4700:20::ac43:4a94"
        ],
        "first_seen": "2026-11-21T17:56:00.730Z",
        "last_seen": "2026-11-21T17:56:00.730Z",
        "checks": 1
      }
    ],
    "hosting": [
      {
        "value": "Cloudflare",
        "evidence": "Server header \"cloudflare\""
      }
    ],
    "software": [],
    "server_info": {
      "name": "mcp-change-order",
      "version": "0.22.6",
      "protocol_version": "2025-06-18"
    },
    "headers": {
      "server": "cloudflare",
      "strict-transport-security": "max-age=15552000; includeSubDomains; preload"
    },
    "auth": null
  },
  "related": {
    "same_address": {
      "total": 266,
      "sample": [
        {
          "id": "21701",
          "url": "https://thisweekend.events/mcp",
          "server_name": "events.thisweekend/this-weekend",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T17:48:02.146Z"
        },
        {
          "id": "39883",
          "url": "https://activity-diagram.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/activity-diagram",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:17:02.429Z"
        },
        {
          "id": "39886",
          "url": "https://mcp.zovo.one/mcp/amortization",
          "server_name": "io.github.theluckystrike/amortization",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:18:02.303Z"
        },
        {
          "id": "39887",
          "url": "https://anniversary-poster.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/anniversary-poster",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:19:01.793Z"
        },
        {
          "id": "39889",
          "url": "https://ar-aging.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/ar-aging",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:20:02.880Z"
        },
        {
          "id": "39890",
          "url": "https://mcp.zovo.one/mcp/asset-register",
          "server_name": "io.github.theluckystrike/asset-register",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:21:01.471Z"
        },
        {
          "id": "39893",
          "url": "https://avery-labels.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/avery-labels",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:22:01.864Z"
        },
        {
          "id": "39894",
          "url": "https://avg-balance.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/avg-balance",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:23:02.046Z"
        },
        {
          "id": "39895",
          "url": "https://baby-names.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/baby-names",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:24:02.016Z"
        },
        {
          "id": "39896",
          "url": "https://mcp.zovo.one/mcp/backlink-checker",
          "server_name": "io.github.theluckystrike/backlink-checker",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:25:02.331Z"
        },
        {
          "id": "39897",
          "url": "https://bank-check.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/bank-check",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:26:02.270Z"
        },
        {
          "id": "39898",
          "url": "https://bank-reconciliation.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/bank-reconciliation",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:27:01.744Z"
        },
        {
          "id": "39899",
          "url": "https://mcp.zovo.one/mcp/bank-statement",
          "server_name": "io.github.theluckystrike/bank-statement-csv-categorize-reconcile-ledger",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:28:02.000Z"
        },
        {
          "id": "39900",
          "url": "https://mcp.zovo.one/mcp/bank-statement-pdf",
          "server_name": "io.github.theluckystrike/bank-statement-pdf",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:29:01.457Z"
        },
        {
          "id": "39901",
          "url": "https://bank-to-qbo.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/bank-to-qbo",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:30:03.567Z"
        },
        {
          "id": "39902",
          "url": "https://barcode-maker.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/barcode-maker",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:31:01.516Z"
        },
        {
          "id": "39903",
          "url": "https://mcp.zovo.one/mcp/barcode",
          "server_name": "io.github.theluckystrike/barcode-qr-code-sepa-payment-ean13",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:32:01.873Z"
        },
        {
          "id": "39904",
          "url": "https://bill-calendar.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/bill-calendar",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:33:01.925Z"
        },
        {
          "id": "39905",
          "url": "https://mcp.zovo.one/mcp/bill-of-sale",
          "server_name": "io.github.theluckystrike/bill-of-sale",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:34:01.950Z"
        },
        {
          "id": "39906",
          "url": "https://bill-splitter.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/bill-splitter",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:35:02.331Z"
        }
      ]
    },
    "same_site": {
      "total": 265,
      "sample": [
        {
          "id": "39883",
          "url": "https://activity-diagram.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/activity-diagram",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:17:02.429Z"
        },
        {
          "id": "39886",
          "url": "https://mcp.zovo.one/mcp/amortization",
          "server_name": "io.github.theluckystrike/amortization",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:18:02.303Z"
        },
        {
          "id": "39887",
          "url": "https://anniversary-poster.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/anniversary-poster",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:19:01.793Z"
        },
        {
          "id": "39889",
          "url": "https://ar-aging.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/ar-aging",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:20:02.880Z"
        },
        {
          "id": "39890",
          "url": "https://mcp.zovo.one/mcp/asset-register",
          "server_name": "io.github.theluckystrike/asset-register",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:21:01.471Z"
        },
        {
          "id": "39893",
          "url": "https://avery-labels.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/avery-labels",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:22:01.864Z"
        },
        {
          "id": "39894",
          "url": "https://avg-balance.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/avg-balance",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:23:02.046Z"
        },
        {
          "id": "39895",
          "url": "https://baby-names.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/baby-names",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:24:02.016Z"
        },
        {
          "id": "39896",
          "url": "https://mcp.zovo.one/mcp/backlink-checker",
          "server_name": "io.github.theluckystrike/backlink-checker",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:25:02.331Z"
        },
        {
          "id": "39897",
          "url": "https://bank-check.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/bank-check",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:26:02.270Z"
        },
        {
          "id": "39898",
          "url": "https://bank-reconciliation.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/bank-reconciliation",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:27:01.744Z"
        },
        {
          "id": "39899",
          "url": "https://mcp.zovo.one/mcp/bank-statement",
          "server_name": "io.github.theluckystrike/bank-statement-csv-categorize-reconcile-ledger",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:28:02.000Z"
        },
        {
          "id": "39900",
          "url": "https://mcp.zovo.one/mcp/bank-statement-pdf",
          "server_name": "io.github.theluckystrike/bank-statement-pdf",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:29:01.457Z"
        },
        {
          "id": "39901",
          "url": "https://bank-to-qbo.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/bank-to-qbo",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:30:03.567Z"
        },
        {
          "id": "39902",
          "url": "https://barcode-maker.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/barcode-maker",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:31:01.516Z"
        },
        {
          "id": "39903",
          "url": "https://mcp.zovo.one/mcp/barcode",
          "server_name": "io.github.theluckystrike/barcode-qr-code-sepa-payment-ean13",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:32:01.873Z"
        },
        {
          "id": "39904",
          "url": "https://bill-calendar.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/bill-calendar",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:33:01.925Z"
        },
        {
          "id": "39905",
          "url": "https://mcp.zovo.one/mcp/bill-of-sale",
          "server_name": "io.github.theluckystrike/bill-of-sale",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:34:01.950Z"
        },
        {
          "id": "39906",
          "url": "https://bill-splitter.zovo.one/mcp",
          "server_name": "io.github.theluckystrike/bill-splitter",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:35:02.331Z"
        },
        {
          "id": "39907",
          "url": "https://mcp.zovo.one/mcp/billing-docs",
          "server_name": "io.github.theluckystrike/billing-docs-credit-notes-purchase-orders",
          "last_state": "listed",
          "last_checked_at": "2026-11-22T21:36:02.454Z"
        }
      ]
    },
    "same_tool_list": {
      "total": 0,
      "sample": []
    },
    "same_publisher": {
      "publisher": "io.github.theluckystrike",
      "total": 427,
      "sample": [
        {
          "name": "io.github.theluckystrike/ab-test-sample-size-calculator-mcp",
          "title": "A/B Test Sample Size Calculator MCP"
        },
        {
          "name": "io.github.theluckystrike/aca-premium-tax-credit-calculator-mcp",
          "title": "ACA Premium Tax Credit Calculator"
        },
        {
          "name": "io.github.theluckystrike/activity-diagram",
          "title": "Zovo Activity Diagram"
        },
        {
          "name": "io.github.theluckystrike/address-to-census-tract-mcp",
          "title": "Address to Census Tract MCP"
        },
        {
          "name": "io.github.theluckystrike/aging",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/agreement",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/airport-delays-faa-status-mcp",
          "title": "Airport Delays (FAA Airport Status) MCP"
        },
        {
          "name": "io.github.theluckystrike/amortization",
          "title": "McpStamp Loan Amortization"
        },
        {
          "name": "io.github.theluckystrike/anniversary-poster",
          "title": "Zovo Love Story Poster"
        },
        {
          "name": "io.github.theluckystrike/ap-score-distributions-mcp",
          "title": "AP Score Distributions"
        },
        {
          "name": "io.github.theluckystrike/application",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/appointment",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/ar-aging",
          "title": "Zovo AR Aging Report"
        },
        {
          "name": "io.github.theluckystrike/archive",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/asset-register",
          "title": "McpStamp Asset Register"
        },
        {
          "name": "io.github.theluckystrike/aurora-forecast-kp-index-mcp",
          "title": "Aurora Forecast and Kp Index MCP"
        },
        {
          "name": "io.github.theluckystrike/availability",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/avalanche-forecast-danger-rating-mcp",
          "title": "Avalanche Forecast and Danger Rating MCP"
        },
        {
          "name": "io.github.theluckystrike/avery-labels",
          "title": "Sheetwise Label Maker"
        },
        {
          "name": "io.github.theluckystrike/avg-balance",
          "title": "Zovo Average Balance"
        }
      ]
    },
    "same_repository": {
      "repository_url": "https://github.com/theluckystrike/mcp-servers",
      "total": 201,
      "sample": [
        {
          "name": "com.bestremotetools/archive-zip-unzip-bomb-guard",
          "title": null
        },
        {
          "name": "com.bestremotetools/bank-statement-import-categorise-reconcile",
          "title": null
        },
        {
          "name": "com.bestremotetools/calendar-ics-events-free-busy",
          "title": null
        },
        {
          "name": "com.bestremotetools/contract-clause-library-assemble",
          "title": null
        },
        {
          "name": "com.bestremotetools/delivery-schedule-milestones-late-report",
          "title": null
        },
        {
          "name": "com.bestremotetools/image-resize-convert-compress-crop",
          "title": null
        },
        {
          "name": "com.bestremotetools/image-resize-convert-compress-watermark",
          "title": null
        },
        {
          "name": "com.bestremotetools/invoice-vat-pdf-numbered",
          "title": null
        },
        {
          "name": "com.bestremotetools/pdf-merge-split-stamp-extract-text",
          "title": null
        },
        {
          "name": "com.bestremotetools/price-drop-watch-alert-history",
          "title": null
        },
        {
          "name": "com.bestremotetools/qr-barcode-wifi-vcard-sepa",
          "title": null
        },
        {
          "name": "com.bestremotetools/quote-vat-accept-to-invoice",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/aging",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/agreement",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/amortization",
          "title": "McpStamp Loan Amortization"
        },
        {
          "name": "io.github.theluckystrike/application",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/appointment",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/archive",
          "title": null
        },
        {
          "name": "io.github.theluckystrike/asset-register",
          "title": "McpStamp Asset Register"
        },
        {
          "name": "io.github.theluckystrike/availability",
          "title": null
        }
      ]
    },
    "note": "Shared addresses on big platforms (Cloudflare, Vercel and the like) put unrelated servers together; those are marked shared_infrastructure. A match is a pivot, not a link between operators."
  },
  "endpoint": {
    "id": "39927",
    "server_name": "io.github.theluckystrike/change-order",
    "url": "https://mcp.zovo.one/mcp/change-order",
    "host": "mcp.zovo.one",
    "transport": "streamable-http",
    "last_checked_at": "2026-11-22T21:54:01.579Z",
    "last_state": "listed",
    "last_detail": null,
    "consecutive_failures": 0,
    "current_sha": "89dc0b6cf736610157930a1d875556a11d98e2bcbafaefae0bce75258ce89ff8",
    "first_listed_at": "2026-11-21T17:56:00.730Z",
    "created_at": "2026-11-21T12:05:05.931Z",
    "resolved_addresses": [
      "104.26.14.32",
      "104.26.15.32",
      "172.67.74.148",
      "2606:4700:20::ac43:4a94",
      "2606:4700:20::681a:e20",
      "2606:4700:20::681a:f20"
    ]
  },
  "server": {
    "name": "io.github.theluckystrike/change-order",
    "title": "McpStamp Change Orders",
    "description": "Change orders against quotes and work orders: line changes, approval, running contract value.",
    "version": "0.23.0",
    "registry_status": "active",
    "repository_url": "https://github.com/theluckystrike/mcp-servers",
    "website_url": "https://www.mcpstamp.com/servers/change-order/",
    "published_at": "2026-11-02T02:16:28.295Z",
    "updated_at": "2026-11-02T02:16:28.295Z",
    "first_seen": "2026-11-21T12:05:05.364Z"
  },
  "other_endpoints": [],
  "intel": {
    "capabilities": [],
    "evm_addresses": [],
    "chains": [],
    "tokens": [],
    "computed_at": "2026-11-22T15:56:11.432Z"
  },
  "operator": {
    "key": "zovo.one",
    "name": "theluckystrike",
    "platform": false,
    "marketplace": false
  },
  "needs_sign_in": false,
  "reachability": {
    "window_days": 30,
    "checks": 2,
    "answered": 2,
    "answered_percent": 100,
    "avg_listing_latency_ms": 562,
    "first_check_in_window": "2026-11-21T17:56:00.730Z",
    "consecutive_failures_now": 0,
    "days": [
      {
        "day": "2026-11-21",
        "checks": 1,
        "answered": 1,
        "last_state": "listed"
      },
      {
        "day": "2026-11-22",
        "checks": 1,
        "answered": 1,
        "last_state": "listed"
      }
    ]
  },
  "tool_list": {
    "sha256": "89dc0b6cf736610157930a1d875556a11d98e2bcbafaefae0bce75258ce89ff8",
    "tools": 11,
    "resources": 2,
    "prompts": 2,
    "first_seen": "2026-11-21T17:56:01.000Z",
    "tool_names": [
      "change_order_create",
      "change_order_add_line",
      "change_order_status",
      "change_order_get",
      "change_order_list",
      "change_order_delete",
      "contract_value",
      "change_order_document",
      "change_order_invoice_payload",
      "license_status",
      "license_activate"
    ],
    "declared": {
      "tools": [
        {
          "name": "change_order_create",
          "title": "Raise a change order",
          "description": "Raise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.",
          "inputSchema": {
            "type": "object",
            "$schema": "http://json-schema.org/draft-07/schema#",
            "required": [
              "reference",
              "client",
              "title"
            ],
            "properties": {
              "date": {
                "type": "string",
                "maxLength": 10,
                "description": "The day the change was raised, YYYY-MM-DD. Default today"
              },
              "note": {
                "type": "string",
                "maxLength": 2000
              },
              "title": {
                "type": "string",
                "maxLength": 2000,
                "description": "What the change is, in one line, e.g. Add a second landing page and drop hosting"
              },
              "client": {
                "type": "string",
                "maxLength": 200,
                "description": "The client the change is agreed with, as named on the quote or work order"
              },
              "currency": {
                "type": "string",
                "pattern": "^[A-Za-z]{3}$",
                "description": "ISO code the contract is priced in. Defaults to the shared business profile's currency"
              },
              "reference": {
                "type": "string",
                "maxLength": 64,
                "description": "The quote or work order this change order is against, by its id, e.g. Q-2026-0003 or WO-2026-0001"
              },
              "duplicate_ok": {
                "type": "boolean",
                "description": "Raise it even though an identical change order exists on this reference. Default false"
              },
              "reference_kind": {
                "enum": [
                  "quote",
                  "work_order"
                ],
                "type": "string",
                "description": "What the reference is. Inferred from the id when omitted: WO-... is a work order, anything else a quote"
              },
              "original_value_minor": {
                "type": "integer",
                "maximum": 1000000000000,
                "minimum": 0,
                "description": "The contract value BEFORE any change order, net of VAT, in whole minor units. Required on the first change order against a reference; inherited by every later one"
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "readOnlyHint": false,
            "openWorldHint": false,
            "idempotentHint": false,
            "destructiveHint": false
          }
        },
        {
          "name": "change_order_add_line",
          "title": "Add a changed line",
          "description": "Add one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.",
          "inputSchema": {
            "type": "object",
            "$schema": "http://json-schema.org/draft-07/schema#",
            "required": [
              "change_order",
              "kind",
              "description",
              "quantity",
              "unit_price_minor",
              "reason"
            ],
            "properties": {
              "date": {
                "type": "string",
                "maxLength": 10,
                "description": "The day the change was asked for, YYYY-MM-DD. Default the change order's date"
              },
              "kind": {
                "enum": [
                  "added",
                  "removed",
                  "changed"
                ],
                "type": "string",
                "description": "added for new work, removed for work taken out, changed for a line whose quantity or price moves"
              },
              "note": {
                "type": "string",
                "maxLength": 2000
              },
              "reason": {
                "type": "string",
                "maxLength": 2000,
                "description": "Why, in the client's words if you have them, e.g. Client asked for a second page after the kickoff"
              },
              "quantity": {
                "type": "number",
                "maximum": 1000000,
                "description": "added or removed: how many. changed: the NEW quantity",
                "exclusiveMinimum": 0
              },
              "tax_rate": {
                "type": "number",
                "maximum": 1000,
                "minimum": 0,
                "description": "VAT percent for this line, overriding the shared profile's default"
              },
              "description": {
                "type": "string",
                "maxLength": 2000,
                "description": "The line as it reads on the quote or work order, e.g. Website audit"
              },
              "change_order": {
                "type": "string",
                "maxLength": 200,
                "description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
              },
              "was_quantity": {
                "type": "number",
                "maximum": 1000000,
                "description": "changed only: the quantity before the change",
                "exclusiveMinimum": 0
              },
              "unit_price_minor": {
                "type": "integer",
                "maximum": 1000000000000,
                "minimum": 0,
                "description": "added or removed: the unit price in whole minor units. changed: the NEW unit price. 45000 is EUR 450.00"
              },
              "was_unit_price_minor": {
                "type": "integer",
                "maximum": 1000000000000,
                "minimum": 0,
                "description": "changed only: the unit price before the change, in whole minor units"
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "readOnlyHint": false,
            "openWorldHint": false,
            "idempotentHint": false,
            "destructiveHint": false
          }
        },
        {
          "name": "change_order_status",
          "title": "Move a change order along",
          "description": "Move one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.",
          "inputSchema": {
            "type": "object",
            "$schema": "http://json-schema.org/draft-07/schema#",
            "required": [
              "change_order",
              "status"
            ],
            "properties": {
              "date": {
                "type": "string",
                "maxLength": 10,
                "description": "The day it happened, YYYY-MM-DD. Default today"
              },
              "note": {
                "type": "string",
                "maxLength": 2000,
                "description": "What happened, e.g. Emailed to the client, or Approved by phone, confirmed in writing"
              },
              "status": {
                "enum": [
                  "draft",
                  "sent",
                  "approved",
                  "rejected",
                  "void"
                ],
                "type": "string",
                "description": "The status to move to"
              },
              "change_order": {
                "type": "string",
                "maxLength": 200,
                "description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "readOnlyHint": false,
            "openWorldHint": false,
            "idempotentHint": false,
            "destructiveHint": false
          }
        },
        {
          "name": "change_order_get",
          "title": "Show one change order",
          "description": "Return one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id.",
          "inputSchema": {
            "type": "object",
            "$schema": "http://json-schema.org/draft-07/schema#",
            "required": [
              "change_order"
            ],
            "properties": {
              "change_order": {
                "type": "string",
                "maxLength": 200,
                "description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "readOnlyHint": false,
            "openWorldHint": false,
            "idempotentHint": false,
            "destructiveHint": false
          }
        },
        {
          "name": "change_order_list",
          "title": "List change orders",
          "description": "List change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date.",
          "inputSchema": {
            "type": "object",
            "$schema": "http://json-schema.org/draft-07/schema#",
            "properties": {
              "to": {
                "type": "string",
                "maxLength": 10,
                "description": "Latest date, YYYY-MM-DD"
              },
              "from": {
                "type": "string",
                "maxLength": 10,
                "description": "Earliest date, YYYY-MM-DD"
              },
              "limit": {
                "type": "integer",
                "maximum": 500,
                "minimum": 1,
                "description": "Maximum rows returned, default and ceiling 500"
              },
              "client": {
                "type": "string",
                "maxLength": 200,
                "description": "Only change orders whose client name contains this text"
              },
              "status": {
                "enum": [
                  "draft",
                  "sent",
                  "approved",
                  "rejected",
                  "void",
                  "open"
                ],
                "type": "string",
                "description": "One status, or open for draft and sent together"
              },
              "reference": {
                "type": "string",
                "maxLength": 64,
                "description": "Only change orders against this quote or work order"
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "readOnlyHint": false,
            "openWorldHint": false,
            "idempotentHint": false,
            "destructiveHint": false
          }
        },
        {
          "name": "change_order_delete",
          "title": "Delete an empty draft",
          "description": "Delete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued.",
          "inputSchema": {
            "type": "object",
            "$schema": "http://json-schema.org/draft-07/schema#",
            "required": [
              "change_order"
            ],
            "properties": {
              "change_order": {
                "type": "string",
                "maxLength": 200,
                "description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "readOnlyHint": false,
            "openWorldHint": false,
            "idempotentHint": false,
            "destructiveHint": true
          }
        },
        {
          "name": "contract_value",
          "title": "Running contract value",
          "description": "The running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.",
          "inputSchema": {
            "type": "object",
            "$schema": "http://json-schema.org/draft-07/schema#",
            "required": [
              "reference"
            ],
            "properties": {
              "reference": {
                "type": "string",
                "maxLength": 64,
                "description": "The quote or work order this change order is against, by its id, e.g. Q-2026-0003 or WO-2026-0001"
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "readOnlyHint": false,
            "openWorldHint": false,
            "idempotentHint": false,
            "destructiveHint": false
          }
        },
        {
          "name": "change_order_document",
          "title": "Change order document",
          "description": "Render one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same text also comes back as a .txt download link valid for one hour. Pro.",
          "inputSchema": {
            "type": "object",
            "$schema": "http://json-schema.org/draft-07/schema#",
            "required": [
              "change_order"
            ],
            "properties": {
              "change_order": {
                "type": "string",
                "maxLength": 200,
                "description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "readOnlyHint": false,
            "openWorldHint": false,
            "idempotentHint": false,
            "destructiveHint": false
          }
        },
        {
          "name": "change_order_invoice_payload",
          "title": "Invoice payload for an approved delta",
          "description": "Build the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.",
          "inputSchema": {
            "type": "object",
            "$schema": "http://json-schema.org/draft-07/schema#",
            "required": [
              "change_order"
            ],
            "properties": {
              "tax_rate": {
                "type": "number",
                "maximum": 1000,
                "minimum": 0,
                "description": "VAT percent for lines with no rate of their own, overriding the shared business profile's default"
              },
              "issue_date": {
                "type": "string",
                "maxLength": 10,
                "description": "The invoice issue date, YYYY-MM-DD. Default today"
              },
              "change_order": {
                "type": "string",
                "maxLength": 200,
                "description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "readOnlyHint": false,
            "openWorldHint": false,
            "idempotentHint": false,
            "destructiveHint": false
          }
        },
        {
          "name": "license_status",
          "title": "License status",
          "description": "Report this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes.",
          "inputSchema": {
            "type": "object",
            "$schema": "http://json-schema.org/draft-07/schema#",
            "properties": {}
          },
          "annotations": {
            "readOnlyHint": true,
            "openWorldHint": false,
            "idempotentHint": true,
            "destructiveHint": false
          }
        },
        {
          "name": "license_activate",
          "title": "Activate license",
          "description": "Turn Pro on for this connection with key, an MCPL1.<payload>.<signature> issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it.",
          "inputSchema": {
            "type": "object",
            "$schema": "http://json-schema.org/draft-07/schema#",
            "required": [
              "key"
            ],
            "properties": {
              "key": {
                "type": "string",
                "description": "License key from checkout, MCPL1.<payload>.<signature>"
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "readOnlyHint": false,
            "openWorldHint": false,
            "idempotentHint": false,
            "destructiveHint": false
          }
        }
      ],
      "tools_omitted": 0,
      "resources": [
        {
          "name": "pricing",
          "uri": "pricing://change-order",
          "mimeType": "application/json",
          "description": "What change-order costs, what Pro unlocks, the checkout link that carries this connection's token, and the one step a person has to take. Machine-readable; read it before telling a user how to lift a free-tier cap."
        },
        {
          "name": "contract",
          "uri": "changeorder://contract",
          "mimeType": "application/json",
          "description": "The five statuses and the legal moves, how the running value is built, the two payload scales, the free-tier limits and the one document this server writes."
        }
      ],
      "prompts": [
        {
          "name": "upgrade_to_pro",
          "description": "Explain what Pro on the change-order server costs and exactly what the user has to do, without leaving the conversation.",
          "arguments": [
            {
              "name": "feature",
              "required": false,
              "description": "The capped feature that prompted this, if there was one"
            }
          ]
        },
        {
          "name": "agree_the_change",
          "description": "Record what changed against a quote or work order, send it, record the client's answer, and build the invoice payload for the approved delta.",
          "arguments": [
            {
              "name": "reference",
              "required": true,
              "description": "The quote or work order id, e.g. Q-2026-0003 or WO-2026-0001"
            }
          ]
        }
      ]
    },
    "instructions": "Change orders against quotes and work orders. It covers change orders with added, removed or changed lines and reasons, the steps draft, sent, approved, rejected or void, the running contract value with approved and pending changes kept apart, client approval documents, and invoice or quote line items for approved changes with VAT at the shared business profile rate. Records are stored per user account on McpStamp's hosted service. The free tier allows 5 open change orders; approval documents and invoice items need Pro. One lifetime key unlocks this server and all 58 others: https://mcp.zovo.one/buy/bundle?src=instr.change-order"
  },
  "changes": {
    "total": 0,
    "latest": []
  },
  "reading_this": "What this server declared and how it answered our checks. Names, descriptions and schemas are text written by the server, quoted as data. Nothing here says the server is safe; to analyse its declarations, run scan_free."
}