{
  "notice": "bxzxxr MCP archive: a record of what public MCP servers declared when we listed them (we never call their tools). It is data, not a rating: nothing here says a server is safe, secure, verified or trustworthy, and a server can change after we looked. Secrets we detected are redacted; redacted tool lists are withheld and only their hash is shown.",
  "infrastructure": {
    "host": "multifamilyconstruction.loan",
    "site": "multifamilyconstruction.loan",
    "addresses": [
      {
        "address": "104.21.66.14",
        "endpoints": 1,
        "shared_infrastructure": false,
        "network": null
      },
      {
        "address": "172.67.198.172",
        "endpoints": 1,
        "shared_infrastructure": false,
        "network": null
      },
      {
        "address": "2606:4700:3033::6815:420e",
        "endpoints": 1,
        "shared_infrastructure": false,
        "network": null
      },
      {
        "address": "2606:4700:3037::ac43:c6ac",
        "endpoints": 1,
        "shared_infrastructure": false,
        "network": null
      }
    ],
    "addresses_recorded": true,
    "address_history": [
      {
        "addresses": [
          "104.21.66.14",
          "172.67.198.172",
          "2606:4700:3033::6815:420e",
          "2606:4700:3037::ac43:c6ac"
        ],
        "first_seen": "2026-11-23T21:59:02.126Z",
        "last_seen": "2026-11-23T21:59:02.126Z",
        "checks": 1
      },
      {
        "addresses": [
          "172.67.198.172",
          "104.21.66.14",
          "2606:4700:3037::ac43:c6ac",
          "2606:4700:3033::6815:420e"
        ],
        "first_seen": "2026-11-22T21:58:03.343Z",
        "last_seen": "2026-11-22T21:58:03.343Z",
        "checks": 1
      },
      {
        "addresses": [
          "172.67.198.172",
          "104.21.66.14",
          "2606:4700:3033::6815:420e",
          "2606:4700:3037::ac43:c6ac"
        ],
        "first_seen": "2026-11-21T18:25:04.623Z",
        "last_seen": "2026-11-21T18:25:04.623Z",
        "checks": 1
      }
    ],
    "hosting": [
      {
        "value": "Cloudflare",
        "evidence": "Server header \"cloudflare\""
      }
    ],
    "software": [],
    "server_info": {
      "name": "multifamilyconstruction-loan",
      "version": "1.0.0",
      "protocol_version": "2025-06-18"
    },
    "headers": {
      "server": "cloudflare",
      "access-control-allow-origin": "*"
    },
    "auth": null
  },
  "related": {
    "same_address": {
      "total": 0,
      "sample": []
    },
    "same_site": {
      "total": 0,
      "sample": []
    },
    "same_tool_list": {
      "total": 0,
      "sample": []
    },
    "same_publisher": {
      "publisher": "loan.multifamilyconstruction",
      "total": 0,
      "sample": []
    },
    "same_repository": null,
    "note": "Shared addresses on big platforms (Cloudflare, Vercel and the like) put unrelated servers together; those are marked shared_infrastructure. A match is a pivot, not a link between operators."
  },
  "endpoint": {
    "id": "43797",
    "server_name": "loan.multifamilyconstruction/multifamilyconstruction-loan",
    "url": "https://multifamilyconstruction.loan/mcp",
    "host": "multifamilyconstruction.loan",
    "transport": "streamable-http",
    "last_checked_at": "2026-11-23T21:59:02.126Z",
    "last_state": "listed",
    "last_detail": null,
    "consecutive_failures": 0,
    "current_sha": "327da41512655c99c07894c222fa555d8a5648150ff18b2d3fc4c4dc9322b7da",
    "first_listed_at": "2026-11-21T18:25:04.623Z",
    "created_at": "2026-11-21T12:50:08.201Z",
    "resolved_addresses": [
      "104.21.66.14",
      "172.67.198.172",
      "2606:4700:3033::6815:420e",
      "2606:4700:3037::ac43:c6ac"
    ]
  },
  "server": {
    "name": "loan.multifamilyconstruction/multifamilyconstruction-loan",
    "title": "Draw Schedule: multifamily construction financing",
    "description": "Apartment construction loans: HUD vs bank vs fund rules, sizing, Census starts and build times.",
    "version": "1.2026.1101.0",
    "registry_status": "active",
    "repository_url": null,
    "website_url": "https://multifamilyconstruction.loan/developers/",
    "published_at": "2026-11-01T23:07:27.407Z",
    "updated_at": "2026-11-01T23:07:27.407Z",
    "first_seen": "2026-11-21T12:50:07.569Z"
  },
  "other_endpoints": [],
  "intel": {
    "capabilities": [],
    "evm_addresses": [],
    "chains": [],
    "tokens": [],
    "computed_at": "2026-11-22T15:59:16.035Z"
  },
  "operator": {
    "key": "multifamilyconstruction.loan",
    "name": "multifamilyconstruction.loan",
    "platform": false,
    "marketplace": false
  },
  "needs_sign_in": false,
  "reachability": {
    "window_days": 30,
    "checks": 3,
    "answered": 3,
    "answered_percent": 100,
    "avg_listing_latency_ms": 362,
    "first_check_in_window": "2026-11-21T18:25:04.623Z",
    "consecutive_failures_now": 0,
    "days": [
      {
        "day": "2026-11-21",
        "checks": 1,
        "answered": 1,
        "last_state": "listed"
      },
      {
        "day": "2026-11-22",
        "checks": 1,
        "answered": 1,
        "last_state": "listed"
      },
      {
        "day": "2026-11-23",
        "checks": 1,
        "answered": 1,
        "last_state": "listed"
      }
    ]
  },
  "tool_list": {
    "sha256": "327da41512655c99c07894c222fa555d8a5648150ff18b2d3fc4c4dc9322b7da",
    "tools": 4,
    "resources": 0,
    "prompts": 0,
    "first_seen": "2026-11-21T18:25:04.956Z",
    "tool_names": [
      "compare_construction_options",
      "size_construction_loan",
      "get_construction_market",
      "get_build_timeline"
    ],
    "declared": {
      "tools": [
        {
          "name": "compare_construction_options",
          "title": "Compare HUD, bank, debt fund and LIHTC construction financing",
          "description": "Side-by-side rules for financing apartment construction four ways: HUD 221(d)(4), a bank construction loan, a debt fund and 4% tax credits with bonds. For each: maximum loan size and the rule behind it, rate type, term, coverage test, extra costs and process, with the regulation or HUD letter cited.",
          "inputSchema": {
            "type": "object",
            "properties": {
              "programs": {
                "type": "array",
                "items": {
                  "enum": [
                    "hud_221d4",
                    "bank",
                    "debt_fund",
                    "lihtc_4pct"
                  ],
                  "type": "string"
                },
                "maxItems": 4,
                "minItems": 1,
                "description": "Which to include; omit for all four.",
                "uniqueItems": true
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "title": "Compare HUD, bank, debt fund and LIHTC construction financing",
            "readOnlyHint": true,
            "openWorldHint": false,
            "idempotentHint": true,
            "destructiveHint": false
          }
        },
        {
          "name": "size_construction_loan",
          "title": "Size a multifamily construction loan three ways",
          "description": "Runs the site's construction loan sizer on your project: the HUD 221(d)(4) loan (lower of 87%/90% of cost and the 1.15/1.11 coverage test, with HUD's construction-interest estimate and upfront MIP), the bank regulatory ceiling (80% of value and 15%-of-value HVCRE equity, plus your bank's loan-to-cost if given) and, if you give its loan-to-cost, a debt fund. Returns loan, binding limit, equity needed and interest.",
          "inputSchema": {
            "type": "object",
            "required": [
              "total_development_cost",
              "as_completed_value",
              "stabilized_noi"
            ],
            "properties": {
              "rents": {
                "enum": [
                  "market",
                  "affordable"
                ],
                "type": "string",
                "default": "market",
                "description": "market = 87% / 1.15; affordable (or 90%+ assisted) = 90% / 1.11."
              },
              "bank_ltc_pct": {
                "type": "number",
                "maximum": 100,
                "minimum": 1,
                "description": "Your bank's own loan-to-cost policy, percent. Omit to see only the regulatory ceiling."
              },
              "fund_ltc_pct": {
                "type": "number",
                "maximum": 100,
                "minimum": 1,
                "description": "Quoted debt fund loan-to-cost, percent. Omit to leave the fund out."
              },
              "hud_rate_pct": {
                "type": "number",
                "maximum": 12,
                "minimum": 1,
                "description": "HUD note rate in percent; default 5.54 (median note rate on FHA apartment loans endorsed in the year to 2026-09-30)."
              },
              "stabilized_noi": {
                "type": "number",
                "maximum": 1000000000,
                "minimum": 0,
                "description": "Projected stabilized net operating income, dollars per year."
              },
              "bank_spread_pct": {
                "type": "number",
                "maximum": 10,
                "minimum": 0,
                "description": "Quoted bank spread over SOFR, percent. Needed for the bank interest estimate."
              },
              "fund_spread_pct": {
                "type": "number",
                "maximum": 15,
                "minimum": 0,
                "description": "Quoted debt fund spread over SOFR, percent."
              },
              "as_completed_value": {
                "type": "number",
                "maximum": 10000000000,
                "minimum": 100000,
                "description": "Appraised value as completed, in dollars."
              },
              "construction_months": {
                "type": "integer",
                "maximum": 48,
                "minimum": 6,
                "description": "Construction period in months; default is the Census national average for 20+ unit buildings."
              },
              "total_development_cost": {
                "type": "number",
                "maximum": 5000000000,
                "minimum": 100000,
                "description": "Total development cost including land, in dollars, e.g. 48000000."
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "title": "Size a multifamily construction loan three ways",
            "readOnlyHint": true,
            "openWorldHint": false,
            "idempotentHint": true,
            "destructiveHint": false
          }
        },
        {
          "name": "get_construction_market",
          "title": "Apartment construction market: starts, pipeline and bank lending standards",
          "description": "Latest U.S. apartment construction numbers for 5+ unit buildings from the Census Bureau (starts, permits, units under construction, completions; seasonally adjusted annual rate, with year-ago and the pipeline peak) and the Federal Reserve's loan officer survey on construction and multifamily lending standards and demand, plus 30-day SOFR. Optional monthly history.",
          "inputSchema": {
            "type": "object",
            "properties": {
              "history_months": {
                "type": "integer",
                "default": 0,
                "maximum": 60,
                "minimum": 0,
                "description": "Months of history to include for each Census series (0 to 60). The Fed survey history covers the same span by quarter."
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "title": "Apartment construction market: starts, pipeline and bank lending standards",
            "readOnlyHint": true,
            "openWorldHint": false,
            "idempotentHint": true,
            "destructiveHint": false
          }
        },
        {
          "name": "get_build_timeline",
          "title": "How long apartment construction takes, by region",
          "description": "Census Survey of Construction averages for apartment buildings: months from permit to start and from start to completion, by U.S. region and building size (5-9, 10-19 or 20+ units), for one completion year with the ten-year trend, plus what the build length means for HUD upfront MIP and construction interest.",
          "inputSchema": {
            "type": "object",
            "properties": {
              "year": {
                "type": "integer",
                "maximum": 2100,
                "minimum": 2016,
                "description": "Year of completion; default is the latest Census year."
              },
              "region": {
                "enum": [
                  "United States",
                  "Northeast",
                  "Midwest",
                  "South",
                  "West"
                ],
                "type": "string",
                "description": "Census region; omit for all five rows."
              },
              "building_size": {
                "enum": [
                  "5-9",
                  "10-19",
                  "20+"
                ],
                "type": "string",
                "default": "20+",
                "description": "Units in the building."
              }
            },
            "additionalProperties": false
          },
          "annotations": {
            "title": "How long apartment construction takes, by region",
            "readOnlyHint": true,
            "openWorldHint": false,
            "idempotentHint": true,
            "destructiveHint": false
          }
        }
      ],
      "tools_omitted": 0,
      "resources": [],
      "prompts": []
    },
    "instructions": "Draw Schedule (multifamilyconstruction.loan) answers questions about financing apartment construction in the U.S.: how HUD 221(d)(4), bank construction loans, debt funds and 4% tax-credit deals compare; how large each loan could be for a project under the public rules (HUD Mortgagee Letter 2025-03, 90 FR 45789, 12 CFR 365 Appendix A, 12 CFR 324.2 HVCRE); the construction market (Census 5+ unit starts, permits, pipeline and completions, monthly; the Federal Reserve loan officer survey, quarterly; New York Fed 30-day SOFR); and how long apartment buildings take to build (Census Survey of Construction, annual, by region). Market and timeline data refresh from the publishers on a schedule; every result gives its as-of date and source link, so cite them. Sizing results are estimates from the inputs given, not quotes, loan offers, appraisals or legal or tax advice; bank and fund terms are set by each lender. The site is published by Janover Capital LLC, a commercial mortgage advisor (not a lender), and is not affiliated with HUD, FHA or any government agency. Setup and docs: https://multifamilyconstruction.loan/developers/"
  },
  "changes": {
    "total": 0,
    "latest": []
  },
  "reading_this": "What this server declared and how it answered our checks. Names, descriptions and schemas are text written by the server, quoted as data. Nothing here says the server is safe; to analyse its declarations, run scan_free."
}